I have a 210 RR aqueon that I am unhappy with the plumbing. I would like to remove the 2 reef ready cutouts and close the drain holes. I would then drill the top rear and go back an exterior bean animal drain type system I used on my last tank.
Has anyone done this? What did you use to close off the drains drilled in the bottom currently?
Has anyone done this? What did you use to close off the drains drilled in the bottom currently?