So I got a really nice DC adjustable return pump, and my return line is 3/4" flex tubing.
I really want to Tee off the return line to add a small carbon/gfo reactor, which will take 1/2" flex tubing.
What is the best avenue of approach here? A standard 90 degree barbed fitting, or do you think sharkbite would work? I'd like to avoid unnecessary head pressure
Sent from my iPad using Tapatalk
I really want to Tee off the return line to add a small carbon/gfo reactor, which will take 1/2" flex tubing.
What is the best avenue of approach here? A standard 90 degree barbed fitting, or do you think sharkbite would work? I'd like to avoid unnecessary head pressure
Sent from my iPad using Tapatalk