<p style="text-align:center;">This has been a fun project. I have 400lb of rock going in tomorrow and another 500lb in two weeks :confused2:. The lower tub is for the base rock and as it gets nice and seeded I will move it up top to cherry pick out of.
	
<p style="text-align:center;">Once the system has been up for a few weeks I will setup the skimmer and phos & cal reactors. The system has a 150g tub up top and 100g below to help move more water.
	
<p style="text-align:center;">Here's some of the plumbing steps and the final result with RO running thru it..
	
<p style="text-align:center;">I cut off the old plumbing and got a new bulkhead for the drain off the top system.
	
<p style="text-align:center;">
		 alt="" />
	 alt="" />
	
<p style="text-align:center;">The return pump is a tetrapond 2250 - I put a ball valve on it in case I need to trim it back once the water level is higher..
	
<p style="text-align:center;">
		 alt="" />
	 alt="" />
	
<p style="text-align:center;">I made the spray lines 1" up top and 2" down bottom
	
<p style="text-align:center;">
		 alt="" />
	 alt="" />
	
<p style="text-align:center;">
		 alt="" />
	 alt="" />
	
<p style="text-align:center;">with water flowing
	
<p style="text-align:center;">
		 alt="" />
	 alt="" />
	
<p style="text-align:center;">and the new 250w MH hanging from the ceiling over both.
	
<p style="text-align:center;">
		 alt="" />
	 alt="" />
	
<p style="text-align:center;">
		 alt="" />
	 alt="" />
				
			<p style="text-align:center;">Once the system has been up for a few weeks I will setup the skimmer and phos & cal reactors. The system has a 150g tub up top and 100g below to help move more water.
<p style="text-align:center;">Here's some of the plumbing steps and the final result with RO running thru it..
<p style="text-align:center;">I cut off the old plumbing and got a new bulkhead for the drain off the top system.
<p style="text-align:center;">
 
	<p style="text-align:center;">The return pump is a tetrapond 2250 - I put a ball valve on it in case I need to trim it back once the water level is higher..
<p style="text-align:center;">
 
	<p style="text-align:center;">I made the spray lines 1" up top and 2" down bottom
<p style="text-align:center;">
 
	<p style="text-align:center;">
 
	<p style="text-align:center;">with water flowing
<p style="text-align:center;">
 
	<p style="text-align:center;">and the new 250w MH hanging from the ceiling over both.
<p style="text-align:center;">
 
	<p style="text-align:center;">
 
	 
	
 
	 
	 
	 
	 
	 
 
		 
 
		