Figured I would drop the question into a forum to have the responses available to others in the future. Not sure if it should be under DIY but will let moderators move if needed.
I completed all of the plumbing for my mixing station, since I used PVC Cement, I thought it’s probably important to flush out the pipe after its dried a bit.
Do I need to flush with vinegar or can I just use RO and be good?
How long should you wait before using the plumbing? (dry time says 24hrs)
I completed all of the plumbing for my mixing station, since I used PVC Cement, I thought it’s probably important to flush out the pipe after its dried a bit.
Do I need to flush with vinegar or can I just use RO and be good?
How long should you wait before using the plumbing? (dry time says 24hrs)