- Messages
- 1,514
- Reaction score
- 0
Ok..I have a refug that has been set up for over 5 years and after I rid it of bubble algae I need to hook it up to my 160 system. I can plumb it in no problem but where should I plumb it in at to get the most out of the nutrient export and adding copeds/pods back into the display. Its a 30GAL Acrylic sump that basically has a huge fuge section.
Options:
1. Plumb it into the sump, low flow, easier, more asthetically appealing.
2. Plumb it so it flows directly into the display, more flow, more difficult and less asthetically appealing
Options:
1. Plumb it into the sump, low flow, easier, more asthetically appealing.
2. Plumb it so it flows directly into the display, more flow, more difficult and less asthetically appealing