I've scetched up a plumbing design for the my return, sorry for the crude design. Right now all plumbing is 1.5 in pipe except for the manifold, which would be reduced to 1". I'd put a calcium reactor, GFO and maybe carbon.
I'm pretty sure I should reduce the pipe that runs parallel to the UV? I would like some thoughts, thanks.
Total horizontal run = 15 feet, vertical run is 13 feet.
alt="" />
I'm pretty sure I should reduce the pipe that runs parallel to the UV? I would like some thoughts, thanks.
Total horizontal run = 15 feet, vertical run is 13 feet.