I had designed another 55 and then decided to go to the 75.
Does this LQQK like it will work? I’m running a BA drain system. I did not want a long horizontal run and have read that the BA does not do well. So I’m thinking of moving them from draining in the right side of the old 55 and then in the right side of the middle area.
Will there be enough turbulence to churn the water with just the 2 drains 1” under water? It will then flow to the left and through 2 filter socks. It will dump in the sump close to the PS and then flow to the right and out through the external pump. Then I will have a spray bar in the fuge area pointing to the left to create some movement to the left and up and over to the right. The spray bar will get its water from the external pump.
My current sump flows right to left with the sump in the middle.
alt="" />
Updated 55 drawing.
alt="" />
New 75g design.
alt="" />
Does this LQQK like it will work? I’m running a BA drain system. I did not want a long horizontal run and have read that the BA does not do well. So I’m thinking of moving them from draining in the right side of the old 55 and then in the right side of the middle area.
Will there be enough turbulence to churn the water with just the 2 drains 1” under water? It will then flow to the left and through 2 filter socks. It will dump in the sump close to the PS and then flow to the right and out through the external pump. Then I will have a spray bar in the fuge area pointing to the left to create some movement to the left and up and over to the right. The spray bar will get its water from the external pump.
My current sump flows right to left with the sump in the middle.

Updated 55 drawing.

New 75g design.
