ok...for the herbie...just got my 1" and 3/4" bulkheads from brs. Due to the previously drilled holes being parallel/dead center of the overflow the two 1" bulkheads cannot fit in there. Here are my options 1. grind the bulkheads down a bit to make them fit (risky) or 2...either use the 1" line for drain and a 3/4" line for emergency drain or vice versa..3...perhaps they make a smaller profile bulkhead somewhere? Any thoughts?