Well , Rd and audience, I should have waited about painting the floor. ??? After all the work and tank moving I have done getting this plumbing setup, I scuffed the floor in several paces, looks dirty now. Hey that's OK I have plenty of the tropical paint! after i get everything setup. Got most of the plumbing done today, dang this takes TIME. and measuring 3 times and cut once, oh yeah I'm not a professional plumber, so it takes a lot longer for me. Fiiled up the display tank, looks like BOTH drains are leaking at the rubber hose were I used a clamp. left side is pretty bad. So I took my shop vac and sucked dry the overflow boxes. Gotta get this fixed. It don't look like the bulkheads. Hum this is gonna be a headache I think. The returns lines and bulkheads have no leaks. Still have the DT filled with water and the power head going. Tank does not leak at the seams so far. Oh well time to get some rest and go back to the Power plant tomorrow.
Edit: http://s158.photobucket.com/albums/t114/realstinger/?action=view¤t=thelatest28th003.jpg<br>